PROJECT DEVELOPMENT
Pre-Construction
- Establish Clients needs
- Compare Clients needs
- Perform site feasibility study on selected site which includes:
- Establish preliminary building location on the site
- Prepare building parameters
- Determine zoning ordinance requirements
- Create preliminary building budget based on the information obtained from the above 3 items
Design Period
- Confirm and prioritize client’s needs
- Prepare Building Drawings for Client review
- Update project budget based on Design developments
- Establish schedule
- Institute continuous review of progress design to assure:
- Design functionality
- Construction costs vs. budgetary limitations
- Manage obtaining necessary municipal, state and general permits
- Prepare construction documents
Construction Period
- Provide weekly updates of project schedule
- Provide weekly project meetings with clients and architects
- Provide monthly progress reports
- Coordinate all project financial requirements
- Fast track a project as clients needs dictate
Post-Construction Period
- Administrative close of project
- Provide one year warranty
- Provide warranty check eleven months after project completion
GENERAL CONTRACTING
-
Develop a team approach with Owner/Architect/Engineers for a successful construction project utilizing our professional experience and knowledge
-
Orchestrate a complete construction schedule for project assembly, including the design process, noting key items which need to be addressed and updating the schedule on a weekly basis
-
Develop accurate cost estimates for the team’s use, tracking costs on a monthly basis with written documentation
-
Provide value engineering on a continual basis and make cost saving suggestions on design details
-
Pre-Qualify all subcontractors who are requested to bid the project
-
Review subcontractor bid analysis with team members
-
Submit monthly Project Status Reports to the Owner and the Architect
-
Complete the project in a timely manner, within budget, with first-class quality
-
Provide a one (1) year written guarantee
CONSTRUCTION MANAGEMENT
-
Develop a team approach to work closely through the design phase with the Owner and Architect in planning, coordinating and developing a set of working drawings that meet the Owner’s needs and cost budget
-
Provide a “fast track” approach to the construction process resulting in an earlier start of construction, thus expediting the project completion and producing project cost savings to the owner in construction interest expense
-
Provide monthly written documentation to the Owner and Architect to keep them current regarding the project cost and status of the project schedule
-
Provide a Project Manager to oversee the construction process, who will demonstrate leadership and accountability with the highest degree of professionalism in order to obtain the results expected by the Owner
DESIGN/BUILD
-
Assist the Owner in determining project feasibility prior to investing time and capital
-
Allows the Owner to save money during the design phase when up to 80% of all potential savings are generated
-
The Design/Build approach assures a more tightly controlled schedule while “fast-tracking” a project
-
Design/Build allows the Contractor to establish a price prior to the completion of the working drawings
-
Design/Build gives the Owner an experienced consultant that will lead the process
-
Design/Build creates a team effort
-
Design/Build is a cost saving alternative affording faster completion of the total project and single accountability for the results |
|
|